Nam Long Wasserkraftprojekt

Looking for this project? It’s not listed in our marketplace, but we offer custom solutions. Request a quote and our team will create the perfect proposal for you.

Quantity per Unit: 1 Ton

Project kind: Carbon offsetting

100% Audited and Verified

Nam Long Wasserkraftprojekt

Nam Long Hydropower Project is located 50 km west of Louang Namtha and 9 km northwest of Long District, Louang Namtha Province, Lao PDR. The project is a run-of -river hydropower station. The installed capacity is 5 MW, with annually 37 GWh power supplied to the power grid. The proposed project will result in CO2 emission reduction, as it will displace the power generation that otherwise would be based on a mix of fossil fuels. The reduction in carbon dioxide emissions is estimated to be 24,035 tonnes per year.

Projektübersicht

iconProjektname: Nam Long Wasserkraftprojekt
iconArt des Projekts: Kohlenstoffausgleich
iconProjekttyp: Erneuerbare Energie - Wasserkraft
iconProjekttyp aus dem Register: Klein
Wasserkraft mit geringer Umweltbelastung
iconProjektentwickler: Climate Bridge (Shanghai) Ltd.
iconProjekt-ID: GS2707
iconRegion: Südostasien
iconLand: Laos

Details zum Projekt

iconJahr:2021
iconRegistry:Gold Standard (VER)
iconMechanismus:Reduktion
iconErstes Jahr des Projekts (Jahrgang):2016
iconGeschätzte jährliche Gutschriften:20864
iconCorsia förderfähig:Nein
iconMethodik:AMS-I.D. Netzeinspeisung von erneuerbarer Stromerzeugung

Ziele für nachhaltige Entwicklung

    • check icon SDG 6: Sauberes Wasser und Sanitäreinrichtungen
    • check icon SDG 7: Bezahlbare und saubere Energie
    • check icon SDG 13: Maßnahmen zum Klimaschutz

Gelieferte Dokumente

  • check icon Projektdesign-Dokument (PDD)
  • check icon Verifizierungsbericht
  • check icon Emissions-/Projektbericht
  • check icon Überwachungsbericht

Ecohubx Translations: Text domain loaded successfully!

Request a Quote