Windkraftwerk Canakkale

Looking for this project? It’s not listed in our marketplace, but we offer custom solutions. Request a quote and our team will create the perfect proposal for you.

Quantity per Unit: 1 Ton

Project kind: Carbon offsetting

100% Audited and Verified

Windkraftwerk Canakkale

Çanakkale Wind Power Plant is located between Üvecik Village and Mahmudiye Town of Çanakkale Province in the Western part of Turkey. The total installed capacity is 29.9 MW and annual electricity generation is estimated to be 91,570 MWh. The project consists of 13 Siemens SWT 101 wind turbines, each having a capacity of 2.3 MWs. The electricity will be transmitted to an existing substation at Çanakkale Natural Gas Fired Power Plant via an underground power line. The project was operational on 11th February 2011 and registered on 3rd August 2012 under the Gold Standard.

Projektübersicht

iconProjektname: Windkraftwerk Canakkale
iconArt des Projekts: Kohlenstoffausgleich
iconProjekttyp: Erneuerbare Energie - Windkraft
iconProjekttyp aus dem Register: Windkraft
iconProjektentwickler: Enerjisa Enerji Uretim A.S.
iconProjekt-ID: GS906
iconRegion: Westasien
iconLand: Türkei

Details zum Projekt

iconJahr:2021
iconRegistry:Gold Standard (VER)
iconMechanismus:Reduktion
iconErstes Jahr des Projekts (Jahrgang):2011
iconGeschätzte jährliche Gutschriften:54377
iconCorsia förderfähig:Nein
iconMethodik:ACM0002 Netzeingespeiste Stromerzeugung aus erneuerbaren Quellen

Ziele für nachhaltige Entwicklung

    • check icon SDG 7: Bezahlbare und saubere Energie
    • check icon SDG 8: Menschenwürdige Arbeit und Wirtschaftswachstum
    • check icon SDG 13: Maßnahmen zum Klimaschutz

Gelieferte Dokumente

  • check icon Projektdesign-Dokument (PDD)
  • check icon Verifizierungsbericht
  • check icon Emissions-/Projektbericht
  • check icon Überwachungsbericht

Ecohubx Translations: Text domain loaded successfully!

Request a Quote